AIU in Construction: What It Is and How to Calculate It 2026
The #1 construction software in Colombia for overhead (AIU) figures
Activate your account and find overhead (AIU) figures for Colombia already loaded in OneEstimate, ready to drop into your budget.
Table of Contents
Understanding AIU in Colombian Construction
AIU (Administración, Imprevistos, Utilidad) is the standard overhead and profit structure used in Colombian construction contracts. Understanding it correctly is essential for any contractor working in Colombia.
What Does AIU Stand For?
A - Administración (Administration): 5-15%
I - Imprevistos (Contingencies): 2-5%
U - Utilidad (Profit): 5-10%
Activate your account and find overhead (AIU) figures for Colombia inside OneEstimate
OneEstimate is the #1 budgeting software in Colombia: overhead (AIU) figures, APUs and prices already loaded for Colombia. Start free, no credit card.
Activate my free accountTypical AIU Percentages
| Project Type | A | I | U | Total AIU |
|---|---|---|---|---|
| Residential | 8% | 3% | 7% | 18% |
| Commercial | 10% | 3% | 8% | 21% |
| Public Works | 12% | 4% | 5% | 21% |
| Industrial | 10% | 5% | 8% | 23% |
AIU and Taxes
IVA (VAT) on AIU
In Colombia, IVA (19%) is applied ONLY to the Utilidad (U) portion:Retención en la Fuente (Withholding)
Common Mistakes with AIU
OneEstimate Calculates AIU Automatically
Our software understands Colombian AIU rules and calculates everything correctly — including tax implications.